top of page

Services

bg-logo.png

Since 2009, Syntes Pte Ltd has being the trusted one-stop expert in Air Conditioning & Mechanical Ventilation (ACMV) works and services which include the following:

Design & Building ACMV Systems

  • Design, supply and install new Chiller Plant room

  • Supply, install and replace Air Handling Unit (AHU), Fan Coil Unit (FCU) and Motor

  • Supply and install duct works and electrical panel wiring

  • Supply and install Building Management System (BMS) and control wiring

WhatsApp Image 2023-02-10 at 11.37.11 AM.jpeg
design & building ACMV
WhatsApp Image 2023-02-10 at 11.28.10 AM.jpeg

Hot Tapping

Hot tapping refers to ‘live’ tapping of branch pipe without interfering operations, meaning no need to shut down or drain off water in pipe lines. This service is carried out during installation of :

  • New branch pipes in the pipe line

  • New thermowell for measurement & verification

  • Tie-in pipes to existing pipes

hot tapping

Freezing

Pipe freezing is the fastest way to isolate the ‘live’ service pipe, without draining off the water entirely. Direct Liquid Nitrogen freezing is the affordable way and most commonly used.

This service is carried out during installation of :

  • New branch pipes in the pipe line

  • New thermowell for measurement & verification

  • Tie-in pipes to existing pipes

Freezing image.jpg
freezing
WhatsApp Image 2023-02-10 at 11.13.31 AM.jpeg

Site Installation of Chilled Water Pipes

  • Installation of chilled or hot water pipes

  • Installation of chiller body, fan coil unit (FCU) and alliance heating & air (AHA) pipes

  • Installation of heat exchanger and water heater

  • Installation of floor trap

chilld water pipes

Servicing & Maintaining ACMV Systems

  • Air handling unit (AHU) and fan coil unit (FCU) monthly maintenance

  • Cooling tower or chiller monthly maintenance

  • Pump overhaul and alignment.

WhatsApp Image 2023-02-10 at 10.59.19 AM.jpeg
servicng & maintaining acmv
WhatsApp Image 2023-01-06 at 13.35.56.jpeg

Pre-fabrication of CHW / CW pipes

  • Using BIM to create construction drawing and fabricate off-site

  • Using Robotic Arm to do welding the fittings

  • Save time and  labour wastage

  • Improve workmanship quality in controlled environment

  • Better in time management and shorten timeframe of completion schedule 

pre-fabrication chw/cw

Pre-fabrication of Jacketing Sheets

  • Pre-fabricate the jacketing profile (Elbow, Tee, Cap etc.) using plasma machine

  • Save time and manpower to speed up site installation process

shutterstock_751505995.jpg
pre-fabrication jacketing sheets
bottom of page